TAKT

Takt time, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand. Often confused with cycle time, takt time is a tool used to design work and it measures the average time interval between the start of production of one unit and the start of production of the next unit when items are produced sequentially. For calculations, it is the time to produce parts divided by the number of parts demanded in that time interval. The takt time is based on customer demand; if a process or a production line are unable to produce at takt time, either demand leveling, additional resources, or process re-engineering is needed to ensure on-time delivery. For example, if the customer demand is 10 units per week, then, given a 40-hour workweek and steady flow through the production line, the average duration between production starts should be 4 hours, ideally. This interval is further reduced to account for things like machine downtime and scheduled employee breaks.

PRINCESS CONNECT! Re:Dive CAFE COLLECTION - 2023-05-31T00:00:00.000000Z

PRINCESS CONNECT! Re:Dive ORIGINAL SOUNDTRACK VOL.2 - 2020-02-12T00:00:00.000000Z

Songsforsailing - 2019-02-06T00:00:00.000000Z

Possessed by Pride - 2018-11-08T00:00:00.000000Z

Facedown - 2017-06-14T00:00:00.000000Z

Stronger Ships (Focus) [feat. Takt] - 2019-01-31T00:00:00.000000Z

Similar Artists

長谷部 翔

江原大介

馬渕直純

出口 遼

山崎 真吾

Masato Kouda

中町友洋

小野貴光

中村早織

篠崎あやと

山口朗彦

ウツミタカアキ

内海孝彰

白井友規

奥井康介

佐藤 遥

岩田 賢治

設楽哲也

中川峻彰

太田雅友